




Nov 10 Opus 2 By Friday, the entire foundation was framed and then poured. Special pads for the fireplace and support beam were also poured. The frames will come down Monday to expose the concrete foundation. I had a great time climbing onto the crane and threatening to level the entire lakefront community. One of Silver Lake's many amatuer building inspectors, (Dave Solomon) arrived with his sidekick, Ode, just in time to take pictures of 75% of the Sosnoff family conducting their own inspection. Stay tuned!

1 Comments:
Love the updates. Keep them coming. Makes us think summer!
Post a Comment
<< Home