




NOVEMBER 3 - Upon returning from a few days in the big city, I found that well drilling was in progress. Tasker Wells drilled down to an incredible 620 feet and still had to "hydrofrac" to get a good flow. At 600 feet the Chinese embassy filed a protest and threatened a full diplomatic flap if we continued much further. Luckily, the hydrofrac produced results. Hopefully, the water will not speak Mandarin! Here are some pictures of the rig . The following day, an excavator arrived and finished carving the foundation. Finally, I couldn't help trying the new garage location! Feels right. Stay tuned, Hersh

0 Comments:
Post a Comment
<< Home