Friday, January 26, 2007






Jan 26 - Interior framing continues....Adam & Jim are nailing up interior walls. The pictures show the outline of the master bedroom closets and bath with the roof plan tacked to the wall. The second floor stairs are in and lumber for the 3rd floor is on site. Today's noon temp: 4 (and windy). Stay tuned.

0 Comments:

Post a Comment

<< Home