




Feb 7 - The second story is now almost fully framed and work has begun on the attic and roof system. Here are some pictures taken from the second floor and from a lift above the deck of the 3rd floor. The 2x12s for the rafters have been cut and stacked. We should have a roof in a week. And look at those views! Stay tuned.

0 Comments:
Post a Comment
<< Home